Apply low adhesive tape along the panel edges at double flange joints to protect panel finishes from sealant and for a smoother look when the sealant is applied and tape removed.
Nichiha lap siding installation instructions.
If you have information about others then please share and i will credit you apropriately.
2015 hardiplank lap siding hz10 quick start installation guide.
2015 hardiplank lap siding hz5 quick start installation guide.
Find 3 part specifications installation manuals product certifications safet data sheets and more technical documentation in our convenient resource center.
Walls that are out of plumb for example can negatively impact the installation quality of awp.
Prior to nichiha installation closely inspect exterior wall substrate and correct any problems.
2015 nichiha installation guide.
Shake and lap siding products must be installed horizontally.
Painted within 12 months of installation.
Nichiha spacer may be used in conjunction with panel attachment hardware if necessary to ensure an even substrate.
Do not apply paint when siding is wet.
Follow the manufacturer s instructions for use.
Nichiha does not warrant or accept liability for.
Nichiha spacer may be used in conjunction with panel attachment hardware if necessary to ensure an even substrate.
High quality exterior grade 100 acrylic latex paints are recommended.
Walls that are out of plumb for example can negatively impact the installation quality of awp.
Do not use stain or oil or alkyd based paints on nichiha products.
Apply astm c920 class 35 min compliant sealant into the expansion joint starting at the bottom and pushing sealant into the gap.
Do not install in an angled sloped or other non horizontal chevron sunburst diamond fashion.
A weather resistive barrier is required in accordance with local building codes when installing savannah and sierra boards.
Shake and lap siding products must be installed horizontally.
Use the approved weather resistive barrier wrb as.
With conventional stud spacing 7 16.
Prior to nichiha installation closely inspect exterior wall substrate and correct any problems.
Nichiha awp cladding may be installed on.